Product overview
Fire-tube steam boiler with dual-fuel burner, water level control and flame safety for industrial lines.
Recommended supply configuration Start with the smallest practical Chinese configuration, local foundations and labor, manual handling where safe, and optional automation postponed.
Applications and primary use
- Specific industrial purpose: Fire-tube steam boiler with dual-fuel burner, water level control and flame safety for industrial lines.
- New installation sized to confirmed demand rather than maximum catalogue capacity.
- Replacement or expansion after checking physical, utility and control compatibility.
- Economical Afghan implementation using local installation and fabrication where safe.
Technical specifications and selection parameters
| Selection parameter | Required function / value | Buyer or site input |
|---|---|---|
| Thermal capacity | Meet the calculated heating or cooling load | Provide load calculation or process duty |
| Inlet/outlet conditions | Achieve required temperatures and flow | State design temperatures |
| Ambient condition | Maintain capacity in the actual climate | State summer/winter design values |
| Refrigerant or fuel | Use an available, serviceable energy source | State permitted type |
| Electrical supply | Match voltage, frequency and available load | Provide site data |
| Heat exchanger | Compatible materials and pressure rating | State medium and water quality |
| Controls | Essential staging, alarms and protection | List remote-control needs |
| Installation | Provide piping, ventilation and service clearance | Provide layout |
Buyer checklist and quotation requirements
- Describe the exact process, material and intended operating duty.
- State required capacity, operating hours and acceptable output quality.
- Provide product samples, drawings or technical data where applicable.
- Confirm voltage, frequency and all available utilities.
- Provide factory layout, access and environmental conditions.
- Separate equipment, tooling, freight, installation and optional items.
- Require drawings, running test, acceptance criteria and critical spares before shipment.
Product pricing note
Final pricing for Steam Boiler follows the confirmed technical specification, required capacity or rating, included accessories, inspection scope, delivery terms and destination.
Detailed proposal and next step
The proposal contains the equipment scope, technical selection points, supplier and inspection considerations, delivery planning and Sanaatchi contact details. Final selection follows the confirmed duty, specification and site conditions.
